Registration Dossier

Physical & Chemical properties

Vapour pressure

Currently viewing:

Administrative data

Link to relevant study record(s)

Reference
Endpoint:
vapour pressure
Type of information:
experimental study
Adequacy of study:
key study
Study period:
Experimental Phase scheduled: 11. Dec. 2017 - 19. Jan. 2018
Reliability:
2 (reliable with restrictions)
Rationale for reliability incl. deficiencies:
guideline study with acceptable restrictions
Justification for type of information:
A study conducted according to an internationally recognised method, and under GLP is on-going. The substance is considered to be adequately characterised. Therefore full validation should apply. However, considering that the study is still on-going we will consider this study as reliable with restrictions.
Qualifier:
according to
Guideline:
OECD Guideline 104 (Vapour Pressure Curve)
Version / remarks:
2006
Deviations:
no
Qualifier:
according to
Guideline:
EU Method A.4 (Vapour Pressure)
Version / remarks:
Commission Regulation (EC) No 761/2009 of 23. July 2009, published on 24. Aug. 2009
Deviations:
no
Principles of method if other than guideline:
Not applicable
GLP compliance:
yes (incl. certificate)
Remarks:
a GLP certificate should be included in the final report
Type of method:
static method
Remarks on result:
other: study on-going

study on-going

Conclusions:
study on-going
Executive summary:

study on-going

Description of key information

study on-going

Key value for chemical safety assessment

Additional information

An experimental study, conducted in accordance with conditions recommended in OECD guideline and under GLP, is on-going. It should be considered as a key study. The result should be retained as key data.